Since the state was kind enough to go through every K12 school in the state (back in 2008) and evaluate the condition of the buildings, there’s a fair bit of information to play with.
The general facts- as taken from the Facilities Condition Inventory.
Building | Year Constructed (according to the state’s report) | Deficiency Ratio | Renewal Cost (estimate as of 2008) |
Trego School (the school building proper, including the portable classrooms on the East end) | 1967 | 30.1% | $594,743 |
Teacherage | 1967 | 5.1% | $7,152 |
Bus Equipment Shed | 1960 | 1.8% | $104 |
Fuel Storage Unit | 1960 | 1.8% | $104 |
Evidently, then, the problem was (and given the comparatively low costs of the other repairs, surely still is) the school itself, with a deficiency ratio of 30.1%. With the report estimating the total cost of repairs of the school building at $594,743, the school board will have to prioritize the necessary repairs (surely some of them have been addressed since 2008).
Many of the complaints in the report were reasonably straight forward; Windows should be double paned rather than single and window frames should have thermal breaks. Simple, though the renewal cost is quite spendy ($86,107 in total for windows). Another big ticket item is the two “portable” classrooms on the east side of the school. The report observed “Floor sagging or showing other similar such failure”, and estimated $88,058 to renew.
While the school board did pass a permissive levy which will amount to around $25,500, that’s not going to be sufficient for some of the costlier repairs the school is going to need. With the budget tight (enrollment has gone up, but the funding received from the state is based on a three year average), the school board is going to have to prioritize spending very carefully.